Working in conjunction with the main contractor (Como) we carried out the MEP installation.This project included a strip out of the existing services and replace with new consisting of:
- Validation survey
- Strip out of redundant services
- Modification and Installation of Lighting Control System
- New Lighting Installation, comprising LED Panels
- Fire Alarm Modification
- Small Power Modification
- Ductwork Modifications
- New Grilles
- Replace Sanitryware with new
Project Team
Main Contractors: Como
Architects: Lambert Smith Hampton
