20 Air Street , London

This project was to carry out major modifications to the 5th Floor of 20 Air Street as part on behalf our the client , Standard Industries.
This project consisting of:

  • Installation of Small Power
  • Installation of New UPS
  • Installation of New Lighting
  • Modification to existing Lighting Control System
  • Modifications to existing Fire Alarm
  • Modifications to existing PAVA System
  • Installation of New Leak Detection System
  • Modifications of the FCU Systems
  • Modifications to existing BMS System
  • Installation of New Wall Mounted AC Units and Controls

Project Team

Main Contractors: Como
M&E Consultants: Cundall
Architects: 1100 Architect