Ealing Gateway

Working in conjunction with the main contractor (Como) we carried out the MEP installation.This project included a strip out of the existing services and replace with new consisting of:

  • Validation survey
  • Strip out of redundant services
  • Modification and Installation of Lighting Control System
  • New Lighting Installation, comprising LED Panels
  • Fire Alarm Modification
  • Small Power Modification
  • Ductwork Modifications
  • New Grilles
  • Replace Sanitryware with new

Project Team

Main Contractors: Como
Architects: Lambert Smith Hampton

COMMERCIAL CAT A OTHER PROJECTS

25 Copthall Avenu – Reception

YouTube , 6 Pancras Square London